Experience SIMATIC IT Preactor benefits free for 30 days
Slider

What is included in the trial version?

You get free 30-day access to the Standard version of SIMATIC IT Preactor AS - Advanced Scheduling.

What’s included in the plan?

  • Multi-constraint scheduling (primary, secondary and materials)
  • Material consumption at order level
  • Static FIFO pegging rule
  • In software table and field renaming
  • In software grid view and dialog design
  • Full PIO functionality
  • PESP with Custom Actions to run external code
  • Mid batch update (display only)
  • Attribute based simple setup times
  • Flexible Order Routing
  • ‘Order at a Time’ scheduling (including weighting rule)
  • 12 re-nameable spare fields for attributes.
  • Transfer batching and Slack Times

Benefits you receive

Improvement in delivery performance and productivity

Cycle time reduction

Reduction in raw materials inventory

Improvement in customer service

What is SIMATIC IT Preactor?

Siemens Advanced Planning and Scheduling called SIMATIC IT Preactor is a solution for constraint-based production planning and shop floor scheduling. It enables manufacturers to respond quickly and intelligently to unexpected changes, while satisfying customer demands with shorter lead-times.

Advanced Planning and Scheduling improves the synchronization of manufacturing processes and provides greater visibility to increase utilization and on-time delivery while reducing inventory levels and waste. Its advanced math enables manufacturers to quickly analyze and calculate achievable production schedules while considering multiple constraints and business rules. Planners can generate and evaluate what-if scenarios to achieve the best results.

SIMATIC IT Product variants

SIMATIC IT Preactor AP

Advanced Planning

KNOW MORE

SIMATIC IT Preactor AS

Advanced Scheduling

KNOW MORE

What is SIMATIC IT Preactor AS Standard?

SIMATIC IT Preactor AS Standard uses order-based scheduling to which the user can apply a ranking or weighting to prioritize the orders. It schedules based on availability of resources, additional constraints and the materials required for the order. During the scheduling process SIMATIC IT Preactor AS Standard can take in to account different operation run speeds on different resources, use sequence dependent changeover times based on operation attributes and allow overlaps and slack time between operations.

We will save hours of confusion and cost every month. Talk to us!